国产ladybaby

search
>
Environmental protection industry

Environmental protection industry

Views :

Waste power generation

Chengdu Xingrong renewable energy company under the group has completed and put into operation the first phase of Chengdu Wanxing environmental protection power plant (daily treatment of 2400 tons of domestic waste) and Longfeng environmental protection power plant (daily treatment of 1500 tons of domestic waste); At present, we are stepping up the construction of Wanxing environmental protection power plant (phase II). The daily treatment capacity of the project is 3000 tons.

Landfill leachate treatment

The group's Chengdu Xingrong renewable energy company has put into operation the landfill leachate plant (phase I and phase II), with a daily treatment capacity of 2300 cubic meters; At present, the construction of the third phase of leachate project (scale: 2000 m3 / D) is being carried out.

Solid waste disposal

番茄社区ta9app最新官网_四虎影视1515www_小明永久领域2015台湾大陆. under the group, is constructed in three phases with an annual disposal capacity of nearly 150000 tons / year, including 96000 tons / year of hazardous waste disposal scale, 40 major categories and 457 small categories, covering more than 99% of the industrial enterprises in the province; The third stage disposal scale of hazardous waste is 50000 tons / year, mainly landfill hazardous waste with high salt content (≥ 10%), which further makes up for the short board of hazardous waste disposal capacity in the whole province, and plays an active role in high-quality economic and social development and ecological environment improvement of the province.

There is no content information to display
Please add data record in the background of the website first.

番茄社区ta9app最新官网_四虎影视1515www_小明永久领域2015台湾大陆

http://4.symspa.cnhttp://9.symspa.cnhttp://3.symspa.cnhttp://5.symspa.cnhttp://7.symspa.cnhttp://5.symspa.cnhttp://8.symspa.cnhttp://5.symspa.cnhttp://4.symspa.cnhttp://4.symspa.cn